- Europe News
200m3 Sliding Frame Silo
A bespoke silo design by SPIRAC Ltd from concept to completion – SPIRAC design team work with Anglian Water Special Projects team from the embryonic stage to expedite the full structural design, buildability and installation of the silo.
The tank body construction is manufactured from high-specification glass-fused steel panels which can be shipped flat-pack style and assembled on site.
SPIRAC’s silo discharges into 2 off pc pumps.
Related news
- Asia Pacific News
- Europe News
- Municipal Solutions
- North America News
SPIRAC was asked to install four DRUMGUARDTM units in an existing river water intake (RWI) where there are two intake buildings (IPS1 & IPS2 Inlet Pumping Station) which are used to pump water to a nearby reservoir.
- Europe News
- Exhibitions & Meetings
GORINCHEM - The upcoming edition of both Aqua Nederland Vakbeurs and RioleringsVakdagen will be cancelled due to COVID-19
- Europe News
- Exhibitions & Meetings
Op 17, 18 & 19 maart 2020 Aqua Nederland Vakbeurs in Evenementenhal Gorinchem, Stand H118
- Europe News
We are pleased to announce that SPIRAC has renewed its ISO accreditation certificate in the UK. The certification covers BS EN ISO 9001 (quality), BS EN ISO 14001 (environment) and BS ISO 45001 (Occupational health & safety) which are the three main standards demonstrating our continued commitment to improve in those areas.
- Asia Pacific News
- Europe News
- Municipal Solutions
- North America News
The purpose of the project was to replace three dated coarse screens that provide protection to the pumps. This project was part of an upgrade scheme that aimed to prevent flooding.
- Europe News
- Shaftless Spiral Conveyors
Shaftless spiral conveyors are designed for the transport of otherwise difficult to handle materials, such as municipal dewatered sludge, wastewater screenings, grit, industrial sludges or other sticky, viscous, stringy materials.
- Asia Pacific News
- Europe News
- North America News
A typical sewage treatment plant uses a range of treatment processes to produce recycled water and biosolids. In wastewater treatment, the process can be divided into four steps: pretreatment, primary, secondary and tertiary treatments.
- Asia Pacific News
- Europe News
- Municipal Solutions
- North America News
This Water Treatment Plant was built in 1985 and supplies a population of around 200,000 people with drinking water. Raw water quality has deteriorated over time due to the peaty hills the water runs down before being collected in the reservoir.
- Asia Pacific News
- Europe News
- North America News
The goal of this project was to improve screening to help protect the pumps downstream, the project also responded to concerns raised by local residents regarding odours and noise from the existing screens, which are located outside the main pumping station building. To help address these concerns the equipment is placed in a new soundproof and odour controlled building.
- Europe News
- Grit Handling
SPIRAC was contracted by Tier One Contractor Galliford Try to provide a prefabricated packaged treatment plant for the Bolton Upon Dearne Preliminary Treatment Area (PTA).