The prefabricated Pre Treatment Area assembly has arrived in Sarina/Australia
In this section you will find a range of brief, informative and easy-to-read news articles which provide commentary and updates for across the solids handlings industry. Often the article is provided by one of SPIRAC Group engineer and they are perfect light reading, if you are on public transport or relaxing on the weekend. Grab your device and enjoy read as these articles provide you with a wealth of news at your fingertips.
- Europe News
SPIRAC were asked to design a silo structure raised on legs to allow pumps to be positioned underneath.
- Asia Pacific News
The Goondiwindi Sewage Treatment Plant (STP) plant was constructed in the late 1960’s.
- Europe News
Malmberg Water AB ordered a sliding frame sludge silo with a net volume 125m3.
The silo will store biological digested sludge with :
- 1200kg / m3 density
- 6.5 to 8.0 PH and
- 22% - 30% TS
The silo will be delivered in January 2014.
SPIRAC will provide a prefabricated package treatment plant for the SWRF Preliminary Treatment Area (PTA).
SPIRAC's first three stage vertical lift installation has been successfully commissioned in Malaysia. This system handles dewatered BFP sludge in a pulp and forest products processing plant.