- Europe News
ABATTOIR VEVIBA – BELGIUM www.veviba.be
SPIRAC was asked to design, manufacture and install equipment at the Veviba abattoir in Belgium to be able to increase their capacity to 200 cows per day and to reduce costs. The expansion of the plant had to be completed within 6 weeks.
THE SOLUTION